Design

GORTER CONTROLS has acquired many years of experience in the industry obtaining the following homologations:

Code Experience Homologation
DIN DVGW 25 years DVGW(Germany)
MSW-14-E
MSW-7-E
40 years Gasunie(Netherlands)

The operational environment includes all relevant equipment for manufacturing, manipulation and the assembly of all product lines as well as all necessary equipment for static and dynamic prototype testing at the required pressure-ranges and over a wide range of temperatures.

An indication of the production capacities for some of the components are:

Item Capacity/year
Regulators 2500
Safety shut-off valves 2500
Cocon 2500
Test valves 2500
Pilots 2500
Valve modifications 2500

All routine checks and tests that are made during production and prior to delivery are done according to the GORTER CONTROLS standard test and inspection plan. Some examples of inspection activities according to criteria for components are:

Components Inspection Activities Criteria
Regulators Material and test certificates Acc. to EN 334
  Tightness and function test Acc. to EN 334
Shut-off valves Material and test certificates Acc. to PR EN 334
  Tightness and function test Acc. to PR EN 334
Valves Material and test certificates Acc. to API 598/BS5146
  Tightness and function test Cryogen test acc. Shell
Actuators Function test Acc. to TIP supplier

Quality is assured through the GORTER CONTROLS quality manual, designed according to NEN-EN-ISO-9001 standards of 1994.

All incoming goods are subject to sample checks according to the GORTER CONTROLS standard test and inspection plan.